Philafe Engineering Limited.
 

SELECTED PROJECTS:

PROJECT SCOPE

CLIENT’S DETAILS AND LOCATION

DURATION

Construction of  2.8km of 66KV O/H Power line, Baba dogo and  18km 11KV O/H power lines in Bahati and Babadogo.

Siemens Kenya Ltd. KPLC - Loss reduction Project.

Completion: 2007

Construction of  62.5km of 33KV O/H Power lines at Lessos-Kapsabet, Musaga-Sibembe, Nakuru - Elburgon and Marima, c/w new 7.5MVA & 2.5MVA Sub-Stations at Kapsabet and Marima respectively.

Joint Venture with Power Technics Ltd. KPLC - Loss reduction Project.

Completion: 2007

Supply & installation of remote GSM sites 'green' power solution of Wind, Solar & Battery only at Safaricom Faza and Ndau sites.

Safaricom Limited.

Completion: 2007

Supply and Construction of Main Powerlines to Safaricom BTS sites country wide.

Safaricom Limited. May 2006 – In Progress

Provision of Wayleaves services contract (Zone1). AFD – Western Kenya.

Kenya Power and Lighting Co. Ltd AFD Project.

Completion: 2006

Construction 415V system LV reticulation and Service lines.

Safaricom Limited. Maviani  Hilltop Site.

Completion: 2006

Construction of 415V system  LV reticulation and Service line.

Safaricom Limited. Fort Ternan Hilltop Site.

Completion: 2005

Construction of MV/LV overhead/underground reticulation complete with alarm cables.

Safaricom Limited 7No. GSM Sites.

Completed: 2003

Internal and external Electrical Installation works.

Sameer Industrial Park. Main Contractor H.Young (EA) Limited.

Completion: 2003
Electrical Installation Works for Sondu Miriu Hydropower project. Konoike & EPCO Builders Limited. Completion: 2002
Electrical and Earthing Installation Works country wide. H.Young (E.A) Limited. April 2002 – In Progress

Installation of a 1000KVA generator and a 1000KVA 415V/11KV step-up transformer.

Kenya Airport Authority and Naciti Engineers Limited Mombasa.

Completion: 1997

Rehabilitation of the Runway-21 approach lighting system.

Kenya Airport Authority Mombasa and Naciti Engineers Limited Mombasa.

Completion: 1996

PROJECTS PHOTO GALLERY:

image

Assembly of DBS Shelter^

image

Power Transformers in our bulk Stores^

image

7.5MVA transformer works at Sub-Station^

image

Assembly of the DBS Shelter^

image

Overhead Power distribution works^

image

Mounting 4.5KVA Inverters in DBS Shelter^

image

Installed PV Arrays at Faza GSM site^

image

Installation of flood light mast at Sub-Station^

image

Assembled DBS Shelter^

image

Erection of Wind Turbine generator at Ndau^

image

Installing Diesel Tank in DBS Shelter^

image

PV Arrays termination Boxes^

image

Installation of Air-Break Switch at Sub-Station^

image

Terminal pole works in a power Sub-Station^

image

Installed Wind Turbine generator at Faza^

 